Cement/Sand/Aggregate Mixes
To work out the volume for sand/concrete in an area 8' x 4' x 4" thick
convert to metric = 2.4 x 1.2 x 0.1=0.288m3 or 600kg material approximately.
Rendering
Sand and Cement per m3
Mix required:1 : 5 Portland Cement : Sand
1 : 1/2 : 41/2 Portland Cement : Lime : Sand
12.5mm thick will give 50m2 per m3 approximately
19.0mm thick will give 38m2 per m3 approximately
24.5mm thick will give 25m2 per m3 approximately
Mortar Mix
for year round use including winter bricklaying:
Brickwork below dpc level 1 : 4 Portland Cement : Sand with Plasticiser External Walls 1 : 5-6 Portland Cement : Sand with Plasticiser
Brickwork below dpc level
1 : 4 Portland Cement : Sand with Plasticiser
External Walls
1 : 5-6 Portland Cement : Sand with Plasticiser
Alternative mixes which may be used when there is not risk of frost during bricklaying.
Brickwork below DPC level 1 : 5-6 Portland Cement : Sand with Plasticiser or 1 : 1 : 6 Portland Cement : Lime : Sand External Walls
Brickwork below DPC level
or 1 : 1 : 6 Portland Cement : Lime : Sand
1 : 1 : 5-6 Portland Cement : Lime : Sand
or 1 : 41/2 Masonry Cement : Sand
Plastering
Coverage per 50kg bag
Carlite Browning= 7m2 at 11mm thick Carlite Bonding = 7.5m2 at 8mm thick Carlite Finish = 22.5m2 at 2mm thick
Carlite Browning= 7m2 at 11mm thick
Carlite Bonding = 7.5m2 at 8mm thick
Carlite Finish = 22.5m2 at 2mm thick
Bricks
In a m2 = 62 number in a yd2 = 50 number
Blocks
18" x 9"x 4" = 10 number per m2 18" x 9" x 4" = 8 number per yd2
(Metric co-ordinating size 450mm x 225mm)
Slates
(100mm Lap)
600mm x 300mm Duchess = 13.3 per m2 500mm x 250mm Countess = 20 per m2
Corrugated Sheeting
Coverage by width per sheet 3" corrugated iron = 24" 3” corrugated asbestos/cement FIbre = 281/4"
Coverage by width per sheet 3" corrugated iron = 24"
3” corrugated asbestos/cement FIbre = 281/4"